HyD
路政署公開招標一覽
Highways Department tender notices
本頁彙整路政署在 OpenTender.hk 的公開招標紀錄(進行中、已截止、已批出),每日由官方網站抓取更新。正式條款以官網為準。
官方網站 Official site48
合計
2
進行中
7
已截止
39
已批出
招標列表 Tender list
- Extension Works to Lung Fu Road, Tuen Mun進行中HY/2025/15 · 12:00 noon, Friday, 31 July 2026
- Expansion of Bus-Bus Interchange at Tate's Cairn Tunnel, Improvement Works of Kwong Fuk Roundabout, New Metered Carparks at Cape Road and other Site Investigation Works進行中HY/2026/01 · 12:00 noon, Friday, 7 August 2026
- Management, Operation, Installation and Maintenance of the Public Lighting System in Kowloon and New Territories East (2026-2030)已截止02/HY/2026 · 12:00 noon, Friday, 26 June 2026
- Ma Tau Kok Landscaped Deck and the adjoining Waterfront Promenade已截止HY/2026/03 · 12:00 noon, Friday, 12 June 2026
- Preventive Maintenance Programme of Roadside Man-made Slopes/Retaining Walls in New Territories (Package B)已截止09/HY/2025 · 12:00 noon, Friday, 20 March 2026
- Ma Tau Kok Landscaped Deck and the adjoining Waterfront Promenade已截止HY/2026/03 · 12:00 noon, Friday, 12 June 2026
- Preventive Maintenance Programme of Roadside Man-made Slopes/Retaining Walls in New Territories (Package B)已截止09/HY/2025 · 12:00 noon, Friday, 20 March 2026
- Management, Operation, Installation and Maintenance of the Public Lighting System in Kowloon and New Territories East (2026-2030)已截止02/HY/2026 · 12:00 noon, Friday, 26 June 2026
- Upgrade of Footbridge Lightings with Light Emitting Diode in Hong Kong Island已截止HY/2025/12 · 12:00 noon, Friday, 9 January 2026
- Principal Inspection of Lion Rock Tunnel and Associated Studies – Investigation (NEC3 PSC Option A)已批出CE 36/2024 (HY) · 22/09/2025
- Tsing Lung Bridge – Design and Construction (NEC PSC Option A)已批出CE 25/2025 (HY) · 16/6/2026
- Northern Metropolis Highway (San Tin Section) – Design and Construction (NEC4 PSC Option A)已批出CE 41/2025 (HY) · 2/6/2026
- Independent Checking of the Financial Arrangement of Part 2 of the Northern Link Project – Investigation (NEC4 PSC Option A)已批出CE 32/2025 (CE) · 29/12/2025
- Road Light Circuits Improvement in Kowloon City District (NEC ECC HK Edition Option B)已批出HY/2024/17 · 8/7/2025 · HK$30.000M
- Structure Lights Improvement Works in Kwun Tong District and Wong Tai Sin District (NEC ECC HK Edition Option B)已批出HY/2025/07 · 23/12/2025 · HK$14.017M
- Hong Kong Section of Hong Kong-Shenzhen Western Rail Link (Hung Shui Kiu – Qianhai) – Marine Ground Investigation (NEC ECC HK Edition Option B)已批出HY/2025/10 · 18/11/2025 · HK$29.527M
- Pedestrian Link near Chuk Yuen North Estate – Ground Investigation Works已批出HY/2024/07 · 2/4/2026 · HK$6.781M
- Management, Operation, Installation and Maintenance of the Public Lighting System in Hong Kong Island and Islands (2026-2030) (NEC 4 TSC Option A)已批出11/HY/2025 · 10/3/2026 · HK$290.427M
- Preventive Maintenance Programme of Roadside Man-made Slopes/Retaining Walls in Urban Region (Package C) (NEC4 TSC Option A)已批出HY/2024/12 · 20/02/2026 · HK$130.130M
- Upgrade of Footbridge Lightings with Light Emitting Diode in Hong Kong Island (NEC ECC HK Edition Option B)已批出HY/2025/12 · 17/6/2026 · HK$19.800M
- Construction of Walkway Covers near Princess Margaret Hospital, Tung Wah Eastern Hospital, Castle Peak Hospital and Siu Lam Hospital, Wah Sing Street Escalator Link System and Lift and Pedestrian Walkway System between Lau Sin Street and Tin Hau Temple Road (NEC ECC HK Edition Option A)已批出HY/2025/06 · 10/6/2026 · HK$133.980M
- Improvement Works for Junctions at Ming Kum Road, Tuen Mun Heung Sze Wui Road and Hoi Wing Road (NEC ECC HK Edition Option A)已批出HY/2025/14 · 29/4/2026 · HK$28.349M
- Improvement Works for Junctions at Ming Kum Road, Tsing Wun Road and Lung Mun Road (NEC ECC HK Edition Option A)已批出HY/2025/05 · 30/12/2025 · HK$27.160M
- Widening of Yuen Long Highway (Section between Lam Tei Quarry and Tong Yan San Tsuen Interchange) (NEC ECC HK Edition Option C)已批出HY/2025/13 · 26/06/2026 · HK$1,366.490M
- Lift and Pedestrian Walkway System between Lai King Hill Road and Lai Cho Road (NEC ECC HK Edition Option A)已批出HY/2024/02 · 26/6/2026 · HK$129.939M
- 已批出
- Road Light Circuits Improvement in Kowloon City District (NEC ECC HK Edition Option B)已批出— · 8/7/2025 · 30.000
- Pedestrian Link near Chuk Yuen North Estate – Ground Investigation Works已批出— · 2/4/2026 · 6.781